The always astute (and sometimes ascerbic) Steve Usdin of BioCentury has written an important and stimulating article on the road to PDUFA reauthorization.
Must reading.
Here's the link:
Download file
And many thanks to BioCentury for their permission to post this article in its entirety.
Must reading.
Here's the link:
Download file
And many thanks to BioCentury for their permission to post this article in its entirety.

